Design-Build

In an effort to provide the best value to our customers, Star Electric Company began offering Design-Build services to owners and general contractors. We feel this method of construction is a partnership between owner and contractor providing a value-driven, efficient design and construction method. This method puts the design responsibility in our hands significantly reducing the time required to deliver a cost effective project. Projects done with this method are traditionally completed 30% faster than the traditional construction method and the risk to the owner is transferred to the design-built team.

 

Picture1Notable Projects:

  • EDMC Headquarters
  • EDMC Emergency Generator Addition
  • EDMC OHE – Phase 1 thru 4
  • Art Institute of Pittsburgh
  • Try Street Terminal Building (Shannon Hall)
  • Brown Mackie College – Akron
  • Heinz Warehouse Expansion
  • Cranberry Business Park – Building 100, 110, 200, 210, 220 & 250
  • AFCO Cargo Facility
  • Cutler Hammer World Headquarters
  • The Rand Building
  • Cranberry Crossroads Office Building
  • Flabeg Solar Plant
  • PNC.COM 5th Floor Office Fit Out
  • BEAMONE – Victory Road
  • Vincention Nursing Home
  • Propel School
  • 600 Airside Business Park
  • Point Park University – 312/322 Boulevard of the Allies
  • Point Park University – Student Apartments
  • Simplex/Grinnell Headquarters
  • Pittsburgh Logistics Tenant Fit Out
  • Patterson Dental Tenant Fit Out
  • Tollgrade Tenant Fit Out
  • Union Project Phase 1 & 2
  • Filmet
  • Woodlands Meditation Center
  • St. Vincent College – Alfred & Aurelius Hall
  • St. Vincent College – Rooney Hall
  • St. Vincent College – Alfred Hall
  • Pharmacare
  • 421 Seventh Avenue
  • LaRoche College – Wright Library
  • Epiphany Rectory Building
  • Benedictine Sisters Renovations